Skip to content

Free Shipping to UK

Free Shipping to UK

Flycam Flowline Professional Series 12-19kg / 26-42lb

Ergonomic Body Support for Camera & Gimbals

Save 12%
Original price £466.90
Original price £466.90 - Original price £466.90
Original price £466.90
Current price £408.76
£408.76 - £466.90
Current price £408.76
SKU : FLCM-FLN-600N
 
 

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Note: It is recommended to attach the minimum required weight for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Professional Series 12-19kg / 26-42lb
Flycam Flowline Professional Series 12-19kg / 26-42lb

02.

THE FLOWLINE VEST
The Flowline Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably. It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

Flycam Flowline Professional Series 12-19kg / 26-42lb
Flycam Flowline Professional Series 12-19kg / 26-42lb

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline System has various options such as Flowline 300N, 400N, 500N, 600N and 750N and fits multiple Camera and Gimbal Setups between the weight range of 5kg/11lbs to 19kg/42lbs. You can choose the Flycam Model depending on the Payload you plan putting on it and it’ll self-balance that load using the Gas Springs integrated into the design.
The Height adjustable support bar
enables you to adjust the height of the support arm according to your requirement. The top bar also allows for 360° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials and custom-designed Gas Springs, the Flycam Flowline is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Professional Series 12-19kg / 26-42lb

“Images and videos are for demonstration purposes only.”

IN-ACTION VIDEOS

SPECIFICATIONS

FLOWLINE 600N

Payload Capacity

Min-Max: 12kg - 15kg (26lb - 33lb)

NOTE: Using Placid (FLCM-FLN-PLA) with this Flowline model will impact the minimum and maximum payload capacities.

Height

Flycam Flowline Professional Series 12-19kg / 26-42lb

Suspension line 

  Length: 107cm | 42inch when fully stretched
  Material: 3mm Nylon

Top Bar Length

  Including extension : 470mm
  Excluding extension : 340mm

Waist hip strap length

  Min - Max: 87cm - 107cm (34inch - 42inch)

Extension

  13cm | 5inch

Product Weight (Without Packing)

  Complete 4kg (9lb)

FLOWLINE 750N

Payload Capacity

Min-Max: 15kg - 19kg (33lb - 41lb)

NOTE :Using Placid (FLCM-FLN-PLA) with this Flowline model will impact the minimum and maximum payload capacities.

Height

Flycam Flowline Professional Series 12-19kg / 26-42lb

Suspension line 

  Length : 107cm | 42inch when fully stretched
  Material : 3mm Nylon

Top Bar Length

  Including extension : 470mm
  Excluding extension : 340mm

Waist hip strap length

  Min - Max : 87cm - 142cm (34inch - 56inch)

Extension

  13cm | 5inch

Product Weight (Without Packing)

  Complete 4kg (9lb)

IN THE BOX

Flycam Flowline Professional Series 12-19kg / 26-42lb
Packing Bag


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products


Customer Reviews
0.0 Be the first to review this item
5 ★
0% 
0
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:



  • What is the correct spare part for the counterweight system, what type of gas suspension or hydraulic piston does it have?

    The Flycam Flowline 750N has the 750N Hydraulic Gas Spring.

  • Whether I can attach a gimbal such as Ronin SC 2 to this Flowline. If it needs other accessories to make that work

      Yes, you can attach the Ronin SC 2 gimbal with the Flycam Flowline 750N but you need the Proaim handheld Star Ring P-STRG-01.

x

x